Back to news

BPH Equipment supports Balfour Beatty on the Sandsend Coastal Protection Scheme

BPH Equipment supplies 135t Kobelco to Balfour Beatty for the £7m Sandsend Coastal Protection Scheme.

BPH Equipment has supplied a 135t Kobelco crawler crane to Balfour Beatty on the new £7m Sandsend Coastal Protection Scheme near Whitby.

Delivery of the crawler parts and rigging had to take place over two nights on the main A174 carriageway under a road closure using a 110t slave crane.

The first job was to assist in building a pier for the crane to sit on to lower the sectional walls to the beach. 

Back to news