Back to case studies

Felixstowe Port - South Reconfiguration phase 1

BPH Equipment supplied plant which helped increase the capacity at the Port of Felixstowe

The reconfiguration and extension of the Felixstowe Port involved driving a total of 170 large interlocking tubular piles.
 
Two PTC 130HD Vibrodrivers supplied by BPH Equipment were used to partially drive the 2,560mm x 38m long piles. The piles were then driven to level using two BSP CG300 (20t ram) Impact Hammers also supplied by BPH Equipment with special slotted cap and sleeve arrangement adapted to accommodate the ‘L-T interlocking’ system used to connect each pile to the next
Back to case studies